Century Bliss is a premier, new launch residential project by Century Real Estate. It is ideally located on Doddaballapur Road in North Bangalore, which is a rapidly expanding real estate hub. This gated community in Doddaballapura offers luxury high-rise apartments in 1, 2, 3, & 4 BHK layouts, designed to maximize natural light and ventilation.

The project is set over a total land area of 4.24 acres. It features 3 iconic towers with a structure of 2B + 14 floors. It offers 272 premium apartments with sizes ranging from 550 sq. ft to 2137 sq. ft. The project is currently in the new launch stage, providing early-mover advantages for investors and homebuyers looking for property near the North Bangalore industrial corridor.

The RERA number for project is PR/210426/008595, which was approved on 26th April 2026. The plan got its approval from the Doddaballapur Planning Authority (DPA) under the number DPA/TP/CC/282/2025-26.

Quick Facts of Century Bliss at Doddaballapur Bangalore

Fact Category Details
Project Type New Launch Luxury Apartments in North Bangalore
Total Land Area 4.24 Acres
Location Hosahudya Village, KasabaHobli, Doddaballapura
Key Landmark Near Doddaballapur Planning Authority
Open Space 3.19 Acres (High-ratio Greenery)
Unit Variants 1, 2, 3, & 4 BHK Luxury Flats
Apartment Sizes 550 sq. ft to 2137 sq. ft
Total Units 272 Premium Apartments
RERA Status RERA Approved
Towers 3 High-Rise Towers (2B+14 Floors)
Start Date 1st April 2026
Possession 7th April 2031

The location of Century Bliss is situated at Sy No. 37/1A, 37/1B, and 37/2, Hosahudya Village, KasabaHobli, Doddaballapura, Bengaluru Rural, Karnataka 562157. This ideal position places the project in the heart of the North Bangalore growth corridor, offering seamless access to the Doddaballapur Industrial Area and the Kempegowda International Airport (BLR).

This location significantly boosts the investment potential of this Century Real Estate new launch. The project is located near the Doddaballapur-Bangalore Highway, ensuring smooth connectivity to NH 44 (Bellary Road) and the upcoming Satellite Town Ring Road (STRR). These major roadways link the project to key zones like Yelahanka, Devanahalli, and Hebbal. It is an optimal choice for professionals looking for apartments near Doddaballapur Industrial Hub and flats near North Bangalore SEZs.

The proximity to the Doddaballapur Railway Station (approx. 5 km) and the rapid expansion of the Namma Metro network towards North Bangalore further enhance its transit value. With the industrial growth in Bengaluru Rural, there is a rising need for luxury apartments in Doddaballapura and gated communities near NH 44 due to large-scale infrastructure projects and corporate expansions in the region.

Key Highlights and Unique Selling Points

Century Bliss stands out as a top choice for modern living as well as smart investing. Here are the main reasons why this project is a leader in the North Bangalore 2026 market.

1. Large 4.24-Acre Development - This boutique high-rise project features 3 premium towers. Each tower has a modern 2B + 14 floors design. It offers a fresh, upscale look for the area.

2. High Open-Space Ratio - Most city projects are crowded, but Century Bliss is different. It uses 3.19 acres (75%) of the land for open spaces. This gives you 270-degree ventilation and clear views of the green surroundings.

3. Perfect Unit Mix - The project has a home for everyone. You can pick from 1, 2, 3, & 4 BHK luxury apartments. Sizes range from 550 sq. ft. to 2137 sq. ft., fitting both young workers and large families.

4. Close to Work Hubs - Located within the DPA limits, the project is perfect for a "work-near-home" lifestyle. It is very close to the Doddaballapur Apparel Park and major KIADB industrial zones.

5. Smooth Airport Access - The project is in a prime spot. You can reach Kempegowda International Airport in about 35–40 minutes. The route is direct via the NH 44 interchange.

6. High Growth and Value - The Satellite Town Ring Road (STRR) and the wider Bangalore-Doddaballapur Highway drive growth. Real estate here is set for high gains as the city expands North.

7. DPA Approved and RERA Compliant - Your investment is safe. The project is fully cleared by the Doddaballapur Planning Authority. It also holds RERA No: PRM/KA/RERA/1250/301/PR/210426/008595, ensuring total transparency.

8. The "Century Real Estate" Brand - Century is a top developer with a huge land bank. Their projects often have high resale value and rental yields. This is due to their great build quality and on-time delivery.

9. Strong Rental Demand - There is a steady need for homes here. The project is near government offices and industrial hubs. This creates great rental chances from managers working in the local sectors.

Century Bliss Unit Sizes and Configurations

  • 1 BHK: 550 sq. ft. to 824 sq. ft.
  • 2 BHK: 721 sq. ft. to 1111 sq. ft.
  • 3 BHK: 890 sq. ft. to 1664 sq. ft.
  • 4 BHK: 1648 sq. ft. to 2137 sq. ft.

Century Bliss Important Project Dates

The Century Bliss Launch Date is 1 May 2026. This project is a key development for the 2026 real estate calendar in Bengaluru Rural.

  • Official Launch Date: 1st May 2026
  • Construction Period: 5 Years
  • Proposed Completion Date: 7th April 2031
  • Possession Date: April 2031 onwards

Customer Reviews & Ratings

The Century Bliss Reviews are trending positively, which maintains an early rating of 4.6 out of 5. This feedback is driven by project's low-density planning and its perfect location in the Doddaballapur Planning Authority (DPA) limits.

Market experts highlight Century Bliss as a top-tier investment property in North Bangalore for 2026. The project is expected to deliver a high rental yield and great capital appreciation because of the massive industrial expansion in the Doddaballapur-Devanahalli corridor. It is widely regarded as a secure and transparent gated community investment in Bengaluru Rural.

Century Bliss Brochure

The Century Bliss Brochure provides comprehensive details regarding the master plan, unit floor plans, and the layout of the 3 high-rise towers. It also includes the full list of lifestyle amenities, technical specifications, as well as a detailed connectivity map to the airport and STRR. The brochure is available for download as a PDF for interested homebuyers.

RERA Details

Century Bliss RERA Number is PRM/KA/RERA/1250/301/PR/210426/008595. The project has secured all mandatory legal clearances from the Doddaballapur Planning Authority (DPA). This gives a fully compliant and secure real estate investment for Indian and NRI stakeholders.

  • RERA Registration Date: 26th April 2026
  • Approved Plan Number: DPA/TP/CC/282/2025-26
  • Planning Authority: Doddaballapur

Century Bliss EOI Booking

The Expression of Interest (EOI) for units at Century Bliss is at present open. Early applicants are allowed for the priority tower selection. They also get special pre-launch pricing benefits.

  • EOI Amount: ₹1 Lakh (Fully Refundable)
  • Booking Process: It can be done through the authorized channel partners or the official sales gallery.
  • Benefit: Early-bird investors gain access to preferred floors as well as unit orientations before the public price hike.

Payment Structure

The Century Bliss Payment Plan is designed as a construction-linked schedule (CLP), easing the financial burden on buyers.

  • 10% Booking Amount: It is paid to reserve the unit.
  • 10% Agreement Value: Payable during the Sale Agreement execution.
  • 80% Construction Linked: It is spread across milestones over the 5-year development period.

Century Real Estate – News Update (2026)

Century Real Estate is a leading developer in South India, which holds one of the largest land banks in North Bangalore. They have delivered numerous premium townships and luxury apartment projects. In 2026, the brand is focusing on integrated living spaces near the Satellite Town Ring Road (STRR) and the Doddaballapur Industrial Corridor, solidifying its position as a dominant force in the North Bangalore growth story.

Project Highlights

  • Century Bliss Project Type Project Type
    Apartment
  • Century Bliss Starting Price Starting Price
    Rs. ₹0.75 Cr* Onwards
  • Century Bliss Project Status Project Status
    New Launch
  • Century Bliss Total Land Area Land Area
    4.24 Acres
  • Century Bliss Builder Builder
    Century Real Estate
  • Century Bliss Total No Of Towers No Of Towers
    3 High-Rise Towers
  • Century Bliss Unit Typology Unit Type
    1, 2, 3, & 4 BHK
  • Century Bliss Unit Sizes Unit Sizes
    1200 sq. ft to 2100 sq. ft
  • Century Bliss Total Units Total Units
    272
  • Century Bliss Total No of Floors Total No. of Floors
    2B+14 Floors
  • Century Bliss Rera Number Rera No
    PR/210426/008595
  • Century Bliss Possession Date Possession
    7th April 2031

Apartment Types and Price

The prices of apartments at Century Bliss are expected to range from ₹0.75 Crores to ₹2.90 Crores, depending on the unit configuration, floor rise, and total area. These are indicative Century Real Estate pre-launch prices as of 2026. Given the premium positioning and the massive 75% open space ratio, the base rates for these luxury flats in North Bangalore reflect the high growth potential of the Doddaballapur corridor. Below is the detailed table with unit types, size ranges, and indicative price of Century Bliss

Unit Type Size Price
1 BHK 550 to 824 sq. ft. ₹75 Lakhs – ₹1.12 Cr
2 BHK 721 to 1,111 sq. ft. ₹98 Lakhs – ₹1.51 Cr
3 BHK 890 to 1,664 sq. ft. ₹1.21 Cr – ₹2.26 Cr
4 BHK 1,648 to 2,137 sq. ft. ₹2.24 Cr – ₹2.90 Cr

Complete Costing Details


*Prices are indicative and also subject to change based on tower location, unit facing, and specific launch-day offers. Quoted prices exclude GST, registration, and other statutory charges.

Cost Sheet, Payment Plan & Offers

The Century Bliss pricing is engineered to offer a high-value entry point into the North Bangalore investment corridor. Buyers can take advantage of a construction-linked payment plan (CLP), that matches aligns the financial state with the actual physical progress of the 3 towers. This makes it a great option for those seeking luxury homes near the Doddaballapur industrial hub.

Early-bird investors typically see immediate equity growth. Real estate values in Bengaluru Rural are trending upwards because of the Satellite Town Ring Road (STRR) and the rapid industrialization of the Aerospace and Apparel parks nearby.

Floor Plan

Century Bliss offers premium 1, 2, 3, and 4 BHK homes in North Bangalore. This 4.24-acre project near Doddaballapur Road has three high-rise towers with 14 floors. Each home is built for the modern urban family, which focuses on privacy and smart design.

1 BHK Floor Plan


2 BHK Floor Plan


3 BHK Floor Plan


4 BHK Floor Plan


Inventory Distribution

Inventory Type Total Units Total Carpet Area (SqMtr) Exclusive Balcony (SqMtr)
1 BHK 2 128 11
2 BHK 84 7,289 640
3 BHK 170 16,850 1,673
4 BHK 16 2,848 194
Total 272 27,115 2,518

Smart Design: Vastu & Efficiency

This Century Real Estate project uses a Zero-Waste Design. By removing long halls and extra pillars, we give you the most usable space for your money. Every unit follows Vaastu Shastra to boost Prana (energy):

  • Vaastu: North and East entrances, Southeast kitchens (Agni), and Southwest master bedrooms (Nairrutya).
  • Airflow: Large windows provide great cross-ventilation to keep rooms cool.
  • Efficiency: A high Carpet Area to Super Built-up Area (SBA) ratio ensures maximum value.

Detailed Floor Plan Breakdown

1 BHK Apartments

  • Size: 550 – 824 sq. ft. (SBA)
  • Layout: It has combined living-dining area, master suite, and kitchen with utility.
  • Best For: Professionals at Doddaballapur SEZ or rental investors.

2 BHK Apartments

  • Size: 721 – 1,111 sq. ft. (SBA)
  • Layout: Foyer, spacious living room, two bedrooms, and two bathrooms.
  • Balconies: Features a living room deck and a separate laundry utility.

3 BHK Flats (Primary Inventory)

  • Size: 890 – 1,664 sq. ft. (SBA)
  • Layout: Three large bedrooms, a huge dining-living hall, and premium kitchens.
  • Balconies: Dual balconies with views of the 3.19-acre green landscape.

4 BHK Luxury "Sky Mansions"

  • Size: 1,648 – 2,137 sq. ft. (SBA)
  • Layout: Four bedrooms, grand living zones, and select servant quarters.
  • Balconies: Wrap-around balconies with 270-degree views of the skyline.

Visit Our Model Units

Visit the experience center today to tour our fully-furnished apartments!

  • Space: Walk through layouts to see the scale and furniture fit.
  • Quality: Check the vitrified tiles, anti-skid floors, and branded fixtures.
  • Light: See how the 14-floor towers let in natural sunlight all day.

Master Plan

The Century Bliss Master Plan is spread over 4.24 acres to provide a high-end, low-density lifestyle. This project sits in the heart of North Bangalore. It is carefully built to focus on the environment and resident privacy. These homes set a new bar for apartments in Doddaballapura by mixing modern design with a quiet, private feel.

Master Plan

Master Plan Highlights

  • Three High-Rise Towers: A total of 272 premium apartments.
  • 75% Open Space: It has about 3.19 acres of the site is reserved for greenery.
  • Modern Structure: A 2B + 14 floor setup built for total stability.
  • Zoned Amenities: Special spaces for fitness, rest, and social fun.
  • Safe Layout: Walking paths are kept away from cars to protect kids and seniors.

Architectural Excellence: Natural Air and Light

Century Bliss Bangalore is a top example of smart, climate-friendly design. The three towers are placed to catch the natural winds of the Doddaballapur-Devanahalli area.

  • Better Airflow: The space between towers creates wind paths that naturally cool the rooms.
  • More Sunlight: The tower spots allow deep light to reach even the lower floors all day.
  • Total Privacy: Towers are angled so neighbors cannot look directly into your windows.

Master Plan Layout: Zone Identification

Zone Feature / Amenity Description
01 Main Entry / Exit Grand plaza with 24/7 security and smart access.
02 Residential Towers Towers 1, 2, and 3 with 14 floors and basement parking.
03 The Green Core A 3.19-acre park with gardens and seating areas.
04 Recreation Hub An integrated clubhouse with a gym and a big hall.
05 Active Sports Zone Jogging tracks and safe play areas for children.
06 Utility & Services Spaces for waste converters, STP, and power backup.

Key Features of the Project

Entry and Tower Placement

The Main Entrance is on the primary road of Hosahudya Village. It has wide lanes to stop traffic jams. The towers are built on the edges of the land. This ensures most homes have a clear view of the central Green Core. High-floor residents can even see the beautiful Nandi Hills and the city skyline.

Greenery and Parking

With only 25% of the land used for buildings, the project stays open and fresh. The Native Landscaping uses local plants that need less water. To keep the ground safe for walking, we provide Dual Basement Parking. We also offer EV Readiness with charging spots for electric cars.

Transit and Safety

A continuous Jogging Track loops around the park for your daily fitness. Each tower has its own Safe Drop-Off zone for taxis. Also, wide roads allows emergency vehicles like fire trucks can move without any blocks.

Amenities

Century Bliss offers a mix of fun and comfort with luxurious amenities for urban families. The project is set on 4.24 acres. It focuses on low-density living. Nature is the star here, with 3.19 acres (75%) kept as open green space. Located in Doddaballapura, North Bangalore, this gated community provides top-tier fitness and social hubs.

Century Bliss Gym Gymnasium
Century Bliss Swimming Pool Swimming Pool
Century Bliss yoga Yoga Pavilion
Century Bliss videos Video Door Phone
Century Bliss kids Kids Activity Zone
Century Bliss Mini Theater Mini Theater
Century Bliss Tennis Tennis Court
Century Bliss Indoor Games Room Indoor Games Room
Century Bliss Club House Club House
Century Bliss Dance/Music Dance/Music
Century Bliss 24/7 CCTV Monitoring 24/7 CCTV Monitoring
Century Bliss Jogging Track Jogging Track

1. The Signature Clubhouse - Your Social Hub

The social heart of Century Bliss is found within its 3 high-rise towers. These spaces focus on both physical health as well as mental peace.

  • Grand Entrance Lobby: A tall, stylish lounge for residents and guests.
  • Fitness Suite: A modern gym with proper areas for cardio as well as strength training.
  • Yoga & Aerobics Studio: A quiet room with wood floors for mindful exercise.
  • Indoor Games Zone: Fun spots for table tennis, billiards, and foosball.
  • Multipurpose Hall: A large, cool space for parties and community events.
  • Co-Working Lounge: High-speed Wi-Fi areas for those who work from home.

2. Outdoor and Nature-First Experiences

The outdoor areas use the fresh air of North Bangalore to the fullest. With so much open space, you can enjoy:

  • Swimming Pool: A temperature-controlled pool with a pool for toddlers and a sun deck.
  • Jogging & Cycling Track: A long loop for exercise around the project edge.
  • Multisports Court: A versatile court for basketball and badminton.
  • Themed Gardens: Relax in the aromatic garden or on the reflexology path.
  • Amphitheater: An outdoor arena for movies and cultural shows.
  • Children’s Play Area: A safe zone with modern equipment and soft floors.

3. Smart Infrastructure and Safety

Century Bliss uses the latest tech to ensure a smooth life for all 272 apartments.

  • Multi-Tier Security: 24/7 CCTV and guards keep the community safe.
  • Power Backup: Full backup for common areas and limited backup for all units.
  • Sustainable Systems: On-site waste converters and rainwater harvesting.
  • Advanced Lift System: High-speed elevators in each of the 14-floor towers.
  • Basement Parking: Two levels (2B) of parking keep the ground area safe for walking.

Location

Century Bliss is in Hosahudya Village, KasabaHobli, Doddaballapura. This area in Bengaluru Rural is a fast-growing hub for work and life. It is near to the Doddaballapur Integrated Textile Park and the North Bangalore manufacturing zone.

View Location Map


Century Bliss Address

  • Area:Doddaballapura
  • City:Bangalore
  • State:Karnataka
  • Country:India
  • Zip Code:562157

Strategic Location Details

  • Micro-market: Doddaballapura – North Bangalore Industrial Corridor.
  • Work Hubs: It is close to Doddaballapur Apparel Park, Shivakote Industrial Area, and Devanahalli IT/BT Park.
  • Main Roads: Easy access to Doddaballapur-Bangalore Road, NH 44 (Bellary Road), and the Satellite Town Ring Road (STRR).
  • Rail Link: Very close to the Doddaballapur Railway Station.

Project Address

Century Bliss, Sy No. 37/1A, 37/1B, and 37/2, Hosahudya Village, KasabaHobli, Doddaballapura Taluk, Bengaluru Rural, Karnataka – 562157.

Key Landmarks are

The project is located near the Doddaballapur Planning Authority (DPA) Office. Nearby areas include Doddaballapura Town, Devanahalli, and Rajanukunte.

  • Latitude: 13.235005
  • Longitude: 77.549808

Why Choose This Location?

The project is within the Doddaballapur Planning Authority limits. It is perfect for those working in northern industrial zones. You get a fresh environment near the Nandi Hills corridor while staying close to logistics hubs.

  • Airport Reach: 25–30 minutes to Kempegowda International Airport via the STRR.
  • Highway Access: Direct link to NH 44 (Bangalore-Hyderabad Highway).
  • Local Link: About 12 km from Rajanukunte.
  • Industry Close by: Right near the Doddaballapur Apparel Park and SEZs.

Connectivity to Century Bliss

Airport Access

Enjoy a signal-free drive to the airport. Use the STRR as well as the Doddaballapur-Devanahalli link.

  • Distance: About 24 km.
  • Time: 30–35 minutes by car.
  • Options: Private cabs, KSRTC, and BMTC buses are always availale.

Public Transport and Railway

  • Railway: The station is a major stop for trains to Bangalore City as well as Hyderabad.
  • Buses: Frequent BMTC (285 series) and KSRTC buses go to Majestic, Yelahanka, and Hebbal.

Road Network

High-speed roads make travel easy. NH 44 is just 15 minutes away. The STRR helps you skip city traffic to reach Hoskote or Tumkur. Doddaballapur Main Road is also wide as well as smooth for heavy traffic.

Distance from Key Places

Main Area Distance
Doddaballapur Industrial Area 4 km
Devanahalli 18 km
Yelahanka 22 km
Hebbal 32 km

Travel times may change based on traffic and road work.

Upcoming Infrastructure Improvements

  • Completion of the STRR Phase 1: Linking Doddaballapur to the Airport.
  • Proposed Bangalore Suburban Rail (K-RIDE) Extension: To Doddaballapura.
  • Expansion of the Industrial SEZs: In the Doddaballapur-Devanahalli belt.
  • Upgrading of Local State Highways: Into 4-lane corridors.

Market Comparison – Yelahanka vs Doddaballapura

Feature Yelahanka (Mature Hub) Doddaballapura (High-Growth)
Market Phase Developed / Saturated Emerging / Industrial Hub
Avg. Price (2026) ₹10,500+ per sq. ft. ₹7,500 – ₹8,500 per sq. ft.
Open Space Limited High (3.19 Acres in Century Bliss)
Investment Potential Stable Yields High Capital Appreciation

Top 6 Reasons to Choose Doddaballapura for Investment

Doddaballapura is a key part of the Bangalore Rural expansion plan. Century Bliss sits in the heart of this growth belt. Here are the top reasons why this region is perfect for your next investment.

1. The "Industrial & Satellite Town" Growth Corridor

This area is a primary focus for growth in North Bangalore.

  • Doddaballapur Apparel Park: A 225-acre textile hub with over 15,000 workers.
  • KIADB Industrial Area: Home to huge manufacturing and logistics units.
  • STRR: The Satellite Town Ring Road links the town to Devanahalli and Hoskote.
  • Low Density: Unlike crowded East Bangalore, this area offers more space and fresh air.

2. Price Advantage (Yelahanka vs. Doddaballapura)

There is a massive price gap between mature hubs and this emerging corridor.

  • Yelahanka Prices (2026): ₹10,500 – ₹13,000 per sq. ft.
  • Doddaballapura (2026): ₹7,500 – ₹8,500 per sq. ft.
  • Growth Potential: The ₹3,000+ gap offers high capital gains as the STRR and Suburban Rail finish.
  • Trend: Real estate here grows by 10% each year because of new industrial SEZs.

3. High Employment Density

Century BlissDoddaballapuris a top pick for those working in northern tech and industrial belts.

  • Industrial Hub: Located within a 5–8 km radius.
  • Devanahalli IT/BT Park: Only 18 km (25 minutes) away.
  • Aerospace & Hardware Park: Reachable within 30 minutes for the aviation staff.
  • Rajanukunte SEZs: Just 12–15 km away, hosting many corporate offices.

4. Efficient 20–30 Minute Connectivity Grid

  • Airport: It is 35 mins to Kempegowda International Airport via the STRR.
  • Highway:15 mins to NH 44 (Bellary Road) for a trip to the city center.
  • Rail:10 mins to the Doddaballapur Railway Station.
  • Suburban Rail: The K-RIDE project will soon link this area to Majestic in under 45 minutes.

5. Strong Rental Market

Rental demand at Century Bliss is driven by the textile as well as manufacturing sectors.

  • Target Tenants: Senior managers from the Apparel Park and KIADB units.
  • Staff Demand: Logistics pros from Devanahalli also look for homes here.
  • 2026 Rentals: 2 BHK units earn ₹22,000 – ₹32,000 per month.
  • Yields: You can expect a consistent and good rental yield of 3.5% – 5%.

6. Planned Satellite Town Infrastructure

Doddaballapura is becoming a self-sustained town.

  • STRR Link: Better transit to Hoskote, Dobaspet, and Tumkur.
  • Green Buffer: It is close to Nandi Hills, that offers better air and cooler weather.
  • DPA Oversight: The Doddaballapur Planning Authority offers wide roads and dedicated park zones.

Educational Hub: Schools Near Century Bliss

School Name Distance or Time Curriculum Key Highlight (2026)
Columbia Convent 3 km (10 mins) CBSE It is a high-rated local school with modern labs.
Sri Devaraj Urs International 8 km (15 mins) ICSE Large campus with extensive sports facilities.
Vidyashilp Academy 22 km (30 mins) ICSE, ISC Top-tier premium school in the Yelahanka belt.
Presidency University 14 km (20 mins) UG & PG Massive university campus offering diverse degrees.
GITAM University 16 km (25 mins) Tech & Mgmt Renowned institution for engineering students.

Healthcare Infrastructure Near Century Bliss

Hospital Name Distance or Time Key Specialties Highlight (2026)
Doddaballapur Govt Hospital 4 km (10 mins) General Medicine A primary healthcare facility for the region.
Manasa Hospital 5 km (12 mins) Multi-specialty Trusted private hospital for local families.
Manipal Hospital Yelahanka 24 km (35 mins) Multi-specialty Tertiary care center with 24/7 trauma support.
Aster CMI Hospital 32 km (45 mins) Quaternary Care One of Bangalore's most advanced hospitals.

Major Employment Hubs Near Century Bliss

Business Hub Distance / Time Type 2026 Status
Doddaballapur Apparel Park 5 km (10 mins) Textile SEZ Fully operational with 50+ export units.
KIADB Industrial Area 6 km (12 mins) Manufacturing Home to major industrial and logistics brands.
Devanahalli IT Park 18 km (25 mins) IT/BT Hub Rapidly growing corporate zone near airport.
Aero SEZ / Hardware Park 22 km (30 mins) Aviation/Tech Host to Boeing and Airbus suppliers.

Lifestyle & Entertainment Near Century Bliss

Destination Distance / Time Key Features Popular For
D-Mart Doddaballapura 5 km (10 mins) Retail Daily grocery and household shopping.
Nandi Hills 25 km (35 mins) Tourist Spot Weekend trekking and sunrise views.
RMZ Galleria Mall 22 km (30 mins) Shopping/Movies High-end fashion brands and multiplex.
Grover Zampa Vineyards 14 km (20 mins) Leisure Vineyard tours and wine tasting.

Doddaballapura


Featured Image of Century Bliss Doddaballapura

Doddaballapura is a key part of Bengaluru Rural. It sits right on the North Bangalore growth path. The area is near the Doddaballapur Integrated Textile Park and several SEZs. Over the last ten years, this area has grown fast. This is due to the Satellite Town Ring Road (STRR) and the nearby industrial belt.

Century Bliss makes travel easy to these main spots.

  • Doddaballapur Town: 4 km
  • Rajanukunte: 12 km
  • Yelahanka: 22 km
  • Kempegowda International Airport: 24 km
  • Hebbal Flyover: 32 km

Why Choose Doddaballapura for Your New Home?

The area has big industrial growth, fast roads, and large green zones. Unlike busy city centers, this area offers more space. Projects like Century Bliss give you a 75% open space ratio on a big 4.24-acre site.

From Silk Roots to Luxury Living

Once a center for silk and farming, the town is now an industrial leader. The Doddaballapur Apparel Park and KIADB Industrial Area changed the land. The STRR made it a top choice for workers in aerospace and manufacturing. Today, more people are choosing luxury high-rise homes here.

Great Location and Easy Travel

  • Doddaballapur-Bangalore Road: A quick drive to Yelahanka as well as Hebbal.
  • STRR: This road makes it simple to reach Hoskote, Devanahalli, and Tumkur.
  • NH 44 (Bellary Road): Links you to the airport and the Bangalore-Hyderabad Highway.
  • Railway Access: The nearby station is a main stop for the Bangalore Suburban Rail (K-RIDE).
  • Smart Growth: The DPA manages the area for better urban planning.

Big Job Hubs Near the Area

  • Doddaballapur Apparel Park: 5 km
  • KIADB Industrial Area: 6 km
  • Devanahalli IT/BT Park: 18 km
  • Aerospace & Hardware Park: 22 km
  • Manyata Tech Park: 34 km

Real Estate Trends 2026

The market is booming because prices are low as well as jobs are nearby. Investors like Century Bliss because it costs less than homes in Hebbal. With the STRR and Suburban Rail, this is a smart choice for high future value.

Why People Like This Area

  • Better Prices: Costs are often 30-40% lower than other city hubs.
  • Work Near Home: Offers simple access to jobs in textile as well as aerospace zones.
  • Top Travel Options: Many ways to move via rail and road.
  • Cleaner Air: Near Nandi Hills for less pollution and cooler weather.
  • Space to Breathe: Large gated communities with great amenities.

Big Projects Helping the Town Grow

  • STRR: Connects satellite towns with ease.
  • K-RIDE: Links the area to Majestic and the city center.
  • Textile Park: Brings more jobs and export growth.
  • Airport Corridor: Benefits from Aero City and new business hubs.

Doddaballapura is a vital growth zone. With strong highways and more industry, it is a top spot for buyers. Its location makes Century Bliss the perfect home for luxury living and high value.

Bangalore


Featured Image of Century Bliss Bangalore

Bangalore is a global leader in real estate. Known as the "Silicon Valley of India," it is home to huge IT firms and new startups. In 2026, the Bangalore real estate market is growing fast. This is because of the North Bangalore industrial corridor as well as new roads. The city attracts top talent in aerospace, tech, and manufacturing.

Big Infrastructure Projects

New projects help Bengaluru Rural and North Bangalore grow:

  • Satellite Town Ring Road (STRR): This 280 km road links Doddaballapura to Devanahalli. It helps you skip city traffic.
  • Bangalore Suburban Rail (K-RIDE): The Mallige Line will link the city center to Doddaballapura Railway Station.
  • National Highway 44 (NH 44): The wide Bellary Road, offers a fast link from the airport to the city.
  • STRR Phase 1: This road cuts travel time for the Doddaballapur Industrial Area.

The "Industrial Corridor" Impact

Doddaballapura is a key hub in the North Bangalore growth zone. It sits near the growing airport.

  • Doddaballapur Apparel Park: A large SEZ for global textile units.
  • KIADB Industrial Phase 1, 2, & 3: Home to many manufacturing and food firms.
  • Connectivity: Being 24 km from the airport helps businesses save money.
  • Demand: More people want high-rise homes to live near their work.

Global Tech and Manufacturing Presence

Doddaballapura is near many big job hubs. These drive demand for homes at Century Bliss:

  • Doddaballapur Integrated Textile Park
  • Aerospace & Hardware Park (25 mins away)
  • Shell R&D and Boeing India HQ (30 mins away)
  • Rajanukunte IT Belt

Better Value for Your Money

Doddaballapura has better prices than crowded areas like Hebbal:

  • Entry Point: Flats at Century Bliss start at ₹7,500 – ₹8,500 per sq. ft. Hebbal costs over ₹13,000 per sq. ft.
  • Low-Density Living: Century Bliss uses only 25% of its 4.24 acres for buildings. This leaves 3.19 acres as open space.
  • Optimization: Buyers get more indoor space for their money.

Strong Rental Demand

The rental market in Bengaluru Rural stays strong thanks to local industry:

  • Workforce: High demand from senior bosses in the Apparel Park.
  • Corporate Leasing: Firms in the KIADB zone look for 2 and 3 BHK units for staff.
  • Rental Yields: Returns in this area range from 3.5%–5%. This is often higher than in the city center.

This mix of industrial growth and great roads makes Century Bliss a top asset. It is perfect for long-term value and steady rental income.

RERA, Approvals & Legal Documentation


Featured Image of Century Bliss Rera Approvals

The Real Estate Regulatory Authority (RERA) gives a strong legal shield for your home at Century Bliss. This registration proves that Century Real Estate follows strict rules for timelines, money handling, as well as build quality

How RERA Protects You

  • Financial Safety: Under RERA, 70% of project funds stay in a special escrow account. This ensures the money is used only to build Century Bliss.
  • Verified Titles: A RERA number makes getting a home loan easy. It confirms the project has clear land titles and all needed NOCs.

Official Project Approvals

The project is completely approved by the Doddaballapur Planning Authority (DPA). All plans of the project meet the state's urban norms.

  • Approving Authority: Doddaballapur Planning Authority (DPA)
  • Plan Number: DPA/TP/CC/282/2025-26
  • Plan Approval Date: February 26, 2026
  • RERA Number: PRM/KA/RERA/1250/301/PR/210426/008595

Construction and Possession Timeline

As of May 2026, Century Bliss has finished the planning stage. Construction is on track to complete as well as deliver 272 luxury apartments on time.

Milestone Details / Timeline
Plan Approval Received February 26, 2026
Official Project Start April 01, 2026
RERA Registration Date April 21, 2026
Current Status Foundation as well as Earthworks
Proposed Completion July 04, 2031

Bank Loans and Buyer Benefits

Since Century Real Estate is a top-tier developer, and all major banks offer home loan facilities.

  • Partners: Get quick loans from SBI, HDFC, ICICI, and Axis Bank.
  • PMAY: Check for benefits under the Pradhan Mantri Awas Yojana.
  • Easy Payments: Use payment plans linked to construction steps.

Ownership and Land Details

The land has a clear marketable title. This gives a smooth transfer of ownership to you.

  • Khatha Number: 150300301700620273
  • Type of Khata: E-Khatha (Annexure-45)
  • Land Size: 4.24 Acres
  • Location: Hosahudya Village, Doddaballapura, Bengaluru Rural.

Century Bliss Construction Status - August 2026 Live Updates


Featured Image of Century Bliss Construction Status

Century Bliss has moved into active on-site work as the project has the official RERA certification (PRM/KA/RERA/1250/301/PR/210426/008595) now in place. Century Real Estate has started off the foundation stage for this 4.24-acre project in Doddaballapura.

Current Site Progress in Doddaballapura

The engineering team is now busy with the Ground-Level Preparation phase. Plans are approved by the DPA, and the focus is on a strong base for the majestic 3 residential towers.

  • Earthworks & Grading: Excavation began on April 1, 2026. Heavy machines are leveling the site to prepare for the structural piling of the 272 units availale in the project.
  • Site Mobilization: Work on internal roads and site offices is underway. This helps move materials for the 2B + 14 floor towers.
  • Foundation Readiness: Soil testing is almost done. The team will move to active foundation footing by late October 2026.
  • Experience Center: The sales gallery as well as model units are now open. Buyers can visit to see the 75% open green space layout.

Development Timeline & Milestones

The project follows a strict RERA schedule to meet the July 2031 possession date.

Phase 1: Sub-Structure (Basements & Foundation)

Milestone Start Date Estimated Completion
Earthwork & Site Leveling April 01, 2026 December 27, 2026
Plinth Level Completion November 16, 2026 October 17, 2027
Foundation Footing Work October 28, 2026 January 29, 2027
Sub-structure Flooring (2B) March 09, 2027 September 25, 2027

Phase 2: Super-Structure & Finishing

Milestone Start Date Estimated Completion
RCC Main Building Frame August 07, 2027 March 29, 2029
Masonry & Brickwork October 22, 2028 July 19, 2029
Internal & External Plaster April 20, 2029 January 25, 2030
Sanitary & Electrification February 01, 2030 April 07, 2031
Flooring, Tiles & Skirting May 02, 2030 October 29, 2030

Top Engineering Standards

Century Bliss uses an RCC Framed Structure built to handle seismic loads. The fast-track plan ensures that as the 14 floors rise, electrical and plumbing work starts in stages. This keeps the project on path for the 2031 handover.

Live View:

Site visits are now open! You can see the grading progress at Hosahudya Village, near the Doddaballapura industrial corridor.

Century Real Estate: Trust and Quality Since 1973


Featured Image of Century Real Estate

Century Real Estate is a top property builder in Bangalore. They have been a leader for over 50 years. They build famous homes and offices that have changed the North Bangalore skyline. With a huge land bank, they focus on the best parts of the city.

Key Facts at a Glance

  • 50+ Years of expert building.
  • 20+ Projects finished and delivered.
  • 20M+ Sq. Ft. of space built for owners.
  • 3,000+ Acre Land Bank for future growth.

Why People Choose Century Real Estate

  • Proven History: Five decades of high-quality building and land ownership.
  • Great Spots: Every project, like Century Bliss , is near tech parks and the International Airport.
  • Green Living: They plan for more space. Century Bliss has 75% green cover for a resort feel.
  • Honest Deals: All new projects have RERA numbers. This means clear titles and firm move-in dates.

Recent Awards

The company often wins awards for its great design and work:

  • Residential Developer of the Year 2025 (The Economic Times).
  • Best Luxury Project for Century Ethos.
  • Customer Service Award (Realty+ South India).
  • Best Gated Garden (Karnataka Govt, 2025).

"Century Real Estate is a Grade-A builder. They are known for luxury homes with high long-term value."

Century Real Estate Details

Feature Data Point
Started In 1973
Main Office Millers Road, Bengaluru
Founder Dr. P. Dayananda Pai
Current Leader Mr. Ravindra Pai (MD)
Focus Luxury Flats, Villas, and Plots

Frequently Asked Questions


1. Where is Century Bliss located?

The project is in Hosahudya Village, Doddaballapura, in Bengaluru Rural. It is near to the Doddaballapura industrial hub. This spot gives you quick access to the best parts of North Bangalore.

2. Is the project RERA approved?

Yes. It is fully registered with the Karnataka RERA. The official number is PRM/KA/RERA/1250/301/PR/210426/008595. This gives a safe and honest buying process for you.

3. What are the apartment sizes?

Century Bliss has four types of homes:
  • 1 BHK: 550 to 824 sq. ft.
  • 2 BHK: 721 to 1,111 sq. ft.
  • 3 BHK: 890 to 1,664 sq. ft.
  • 4 BHK: 1,648 to 2,137 sq. ft.

4. Who is the developer?

The project is by Century Real Estate. They are one of the oldest and most trusted builders in Bangalore. They have over 50 years of expert experience.

5. How much open space is there?

This is a low-density project. Out of 4.24 acres, a huge 3.19 acres are kept for green space. This means 75% of the land is for nature and fun.

6. How tall are the buildings?

The project has 3 towers. Each tower has 14 floors and 2 basements. The basements provide plenty of safe parking for residents.

7. When can I move in?

The move-in date is set for July 4, 2031. Work started on April 1, 2026. The team follows a strict plan to finish the project on time.

8. Who approved the project plan?

The Doddaballapur Planning Authority (DPA) approved the plans. The official plan number is DPA/TP/CC/282/2025-26, which is signed on February 26, 2026.

9. Can I get a home loan?

Yes! Most top banks offer home loans for this project. This is because it has a RERA number and clear E-Khatha papers. You can pick from many easy payment plans.